Finkel v. Walsh Electrical Contracting, Inc.
Plaintiff: Dr. Gerald Finkel
Defendant: Ryan Walsh, Linda Walsh, BFC Partners, L.P. and Aurora Contractors, Inc.
Cross Defendant: Walsh Electrical Contracting, Inc., Empire Outlet Builders, LLC and Adco Electrical Corporation
Case Number: 1:2017cv07358
Filed: December 18, 2017
Court: US District Court for the Eastern District of New York
Office: Brooklyn Office
Presiding Judge: I Leo Glasser
Referring Judge: Cheryl L Pollak
Nature of Suit: Labor: E.R.I.S.A.
Cause of Action: 29 U.S.C. § 1145 E.R.I.S.A.
Jury Demanded By: None
Docket Report

This docket was last retrieved on December 5, 2019. A more recent docket listing may be available from PACER.

Date Filed Document Text
December 5, 2019 Opinion or Order Filing 98 STIPULATION AND ORDER DISMISSING CASE, that the above-captioned action is hereby dismissed with prejudice as against Defendants Aurora Contractors, Inc. and ADCO Electrical Corporation. The cross-claims between Defendants Aurora Contractors, Inc. and ADCO Electrical Corporations are also hereby dismissed with prejudice. Plaintiffs claims against Defendants Walsh Electrical Contracting, Inc., Ryan Walsh and Linda Walsh and the cross-claims of Defendants Aurora Contractors, Inc. and ADCO Electrical Corporation against Defendant Walsh Electrical Contracting, Inc. are dismissed without prejudice. Ordered by Judge I. Leo Glasser on 12/5/2019. (Layne, Monique)
December 5, 2019 Opinion or Order ORDER, granting #97 Motion to Dismiss. Ordered by Judge I. Leo Glasser on 12/4/2019. (Layne, Monique)
December 3, 2019 Filing 97 MOTION to Dismiss pursuant to Rules 41(a)(1)(A) and 41(a)(2) by Gerald Finkel. (Attachments: #1 Exhibit Stipulation of Dismissal) (Harras, John). (Main Document 97 replaced on 12/3/2019 per phone request by filer). (Layne, Monique).
October 23, 2019 Opinion or Order Filing 96 ENDORSED LETTER - STATUS REPORT ORDER re #95 Stipulation or Status Report due 11/25/2019. So Ordered by Magistrate Judge Cheryl L. Pollak on 10/23/2019. (Caggiano, Diana)
October 22, 2019 Filing 95 STATUS REPORT by Gerald Finkel (Harras, John)
August 26, 2019 Opinion or Order Filing 94 ORDER: On August 20, 2019, plaintiff represented to this Court that the parties had settled this case in principle. Accordingly, the telephone conference scheduled for August 28, 2019 is adjourned sine die. Papers indicating settlement and stipulation of dismissal are to be filed with this Court within sixty (60) days. So Ordered by Magistrate Judge Cheryl L. Pollak on 8/26/2019. (Caggiano, Diana)
August 23, 2019 Opinion or Order ELECTRONIC ORDER granting #93 Motion to Adjourn Conference. Settlement and stipulation of dismissal to be filed within 60 days - 10/23/2019. So Ordered by Magistrate Judge Cheryl L. Pollak on 8/23/2019. (Caggiano, Diana)
August 20, 2019 Filing 93 MOTION to Adjourn Conference by Gerald Finkel. (Harras, John)
July 11, 2019 Filing 92 MINUTE ENTRY for Telephone Conference held on 7/11/2019 before Magistrate Judge Cheryl L. Pollak. Appearance for plaintiff: John Harras. Appearance for defendants: George Rahn / Raymond Castronovo / Jeffery Alan Meyer / David Adam Tauster. Discovery is complete. The parties are engaged in settlement discussions. A Telephone Conference has been set for 8/28/2019 at 4:00 PM before Magistrate Judge Cheryl L. Pollak. (FTR Log #3:35PM - 3:40PM.) (Zisa, Marie)
May 20, 2019 Filing 91 MINUTE ENTRY for Telephone Conference held on 5/20/2019 before Magistrate Judge Cheryl L. Pollak. Appearance for plaintiff: John Harras. Appearance for defendants: Dipesh Patel / Raymond Castronovo / Jeffery Alan Meyer / David Adam Tauster. The parties are to obtain documents from the third-party payroll company and documents requested during depositions before the next telephone conference. The briefing schedule will be discussed at the conference. Telephone Conference set for 7/11/2019 at 3:30 PM before Magistrate Judge Cheryl L. Pollak. (FTR Log #12:35 PM-12:44 PM.) (Zisa, Marie)
May 15, 2019 Filing 90 Letter MOTION to Adjourn Conference and have a status conference by phone, opposed to the in-person settlement conference rescheduled from May 17, 2019 to May 16, 2019. by Gerald Finkel. (Harras, John)
May 15, 2019 Opinion or Order ELECTRONIC ORDER granting #90 Motion to Adjourn Conference. Conference is adjourned to 5/20/2019 @ 12:30 PM by telephone before Magistrate Judge Cheryl L. Pollak. So Ordered by Magistrate Judge Cheryl L. Pollak on 5/15/2019. (Caggiano, Diana)
May 13, 2019 Opinion or Order ELECTRONIC SCHEDULING ORDER: Due to a conflict with the Court's calendar, the in-person Settlement Conference is rescheduled to 5/16/2019 at 10:00 AM before Magistrate Judge Cheryl L. Pollak. So Ordered by Magistrate Judge Cheryl L. Pollak on 5/13/2019. (Zisa, Marie)
April 26, 2019 Filing 89 NOTICE of Change of Address (Tenenbaum, Marc)
April 22, 2019 Filing 88 Defendant ADCO Electrical Corporation's ANSWER to #79 Answer to Complaint, Crossclaim by Adco Electrical Corporation. (Meyer, Jeffery)
April 9, 2019 Filing 87 MINUTE ENTRY for Telephone Conference held on 4/9/2019 before MJ Cheryl L. Pollak. Appearance for plaintiff: John Harras. Appearance for defendants: Dipesh Patel and George, E. Rahn, Jr. / Raymond Castronovo / Jeffery Alan Meyer. Depositions to proceed as set forth in attached Order. The motion for sanctions #80 is denied without prejudice to renew. In-person Settlement Conference set for 5/17/2019 at 11:00 AM before Magistrate Judge Cheryl L. Pollak. The parties are to inform the Court if they prefer to have a Status Conference by telephone. (FTR Log #11:04 AM - 11:13 AM.) (Zisa, Marie) Modified on 4/10/2019 (Caggiano, Diana).
April 9, 2019 Filing 86 Letter Confirming Deposition of Corporate Representative by Adco Electrical Corporation (Meyer, Jeffery)
April 8, 2019 Filing 85 RESPONSE to Motion re #80 MOTION for Sanctions against Aurora and ADCO MOTION to Compel Depositions for Aurora, ADCO, and Walsh filed by Adco Electrical Corporation. (Attachments: #1 Exhibit A - email correspondence) (Meyer, Jeffery)
April 8, 2019 Filing 84 REPLY in Support re #80 MOTION for Sanctions against Aurora and ADCO MOTION to Compel Depositions for Aurora, ADCO, and Walsh, #82 Response in Opposition to Motion filed by Gerald Finkel. (Harras, John)
April 5, 2019 Filing 83 NOTICE of Appearance by George E. Rahn, Jr on behalf of Walsh Electrical Contracting, Inc. (notification declined or already on case) (Rahn, George)
April 4, 2019 Filing 82 RESPONSE in Opposition re #80 MOTION for Sanctions against Aurora and ADCO MOTION to Compel Depositions for Aurora, ADCO, and Walsh filed by Aurora Contractors, Inc.. (Castronovo, Raymond)
April 3, 2019 Filing 81 MOTION to Appear Pro Hac Vice Affidavit in Support of Motion; Certificate of Good Standing from PA; Certificate of Good Standing from NJ Filing fee $ 150, receipt number ANYEDC-11348395. by Walsh Electrical Contracting, Inc.. (Rahn, George)
April 3, 2019 Opinion or Order ELECTRONIC ORDER granting #81 . The attorney shall register for ECF; registration is available online at www.pacer.gov. Once registered, the attorney shall file a notice of appearance and ensure that s/he receives electronic notification of activity in this case. Also, the attorney shall ensure that the $150 admission fee be submitted to the Clerk's Office via filing the event Pro Hac Vice Filing Fee. So Ordered by Magistrate Judge Cheryl L. Pollak on 4/3/2019. (Zisa, Marie)
April 1, 2019 Filing 80 MOTION for Sanctions against Aurora and ADCO, MOTION to Compel Depositions for Aurora, ADCO, and Walsh by Gerald Finkel. (Attachments: #1 Exhibit Ex A - June '18 Notices, #2 Exhibit Ex B - Feb '19 Notices, #3 Exhibit Ex C - Example of Refusal to Schedule Dep, #4 Exhibit Ex D - Emails re Cancelling Dep, #5 Exhibit Ex E - P last offer to reschedule) (Harras, John)
April 1, 2019 Filing 79 ANSWER to #1 Complaint, , CROSSCLAIM against Adco Electrical Corporation, Walsh Electrical Contracting, Inc. by Aurora Contractors, Inc.. (Castronovo, Raymond)
March 22, 2019 Filing 78 MINUTE ENTRY for Telephone Conference held on 3/22/2019 before Magistrate Judge Cheryl L. Pollak. Appearance for plaintiff: John Martin Harras. Appearance for defendant Walsh Electrical Contracting: Dipesh Patel and George E. Rahn (Mr. Rahn informed the Court that is preparing his pro hac vice motion). Appearance for defendant Aurora: David Loglisci (no notice of appearance filed - attorney was filling in for Mr. Castronovo on an emergency basis). Appearance for Adco: Jeffery Alan Meyer. Walsh Electrical is given one final opportunity to produce records by 4/5/2019. Telephone Conference set for 4/9/2019 at 10:30 AM. The Telephone Conference scheduled for 4/3/2019 is cancelled. (FTR Log #3:37pm -4:00pm.) (Zisa, Marie)
March 20, 2019 Opinion or Order ELECTRONIC ORDER granting #77 Motion to Substitute Attorney. Attorney Charles Michael Rowan, Jr. substituted by George E. Rahn and Dipesh Patel of Saul Ewing Arnstein & Lehr LLP. So Ordered by Magistrate Judge Cheryl L. Pollak on 3/20/2019. (Zisa, Marie)
March 19, 2019 Filing 77 MOTION to Substitute Attorney / Stipulation substituting George E. Rahn and Dipesh Patel of Saul Ewing Arnstein & Lehr LLP in the place of Michael Rowan by Walsh Electrical Contracting, Inc.. (Patel, Dipesh)
March 18, 2019 Opinion or Order Filing 76 ORDER re #75 : Telephone Conference set for 3/22/2019 3:30 PM before Magistrate Judge Cheryl L. Pollak. The parties are to initiate the Telephone Conference and contact the Court at 718-613-2360 with all parties on the line. So Ordered by Magistrate Judge Cheryl L. Pollak on 3/18/2019. (Zisa, Marie)
March 14, 2019 Filing 75 Letter by Aurora Contractors, Inc. (Castronovo, Raymond)
February 15, 2019 Opinion or Order Filing 74 ORDER denying #38 Motion to Dismiss Ordered by Judge I. Leo Glasser on 2/15/2019. (Perlman, Alexa)
January 10, 2019 Opinion or Order Filing 73 ORDER: Walsh Electrical to produce documents by 2/16/2019. ADCO and Aurora to supplement their productions to the extent any party is missing something. Depositions to proceed unless a stay is granted. Telephone Conference set for 4/3/2019 at 10:00 AM. So Ordered by Magistrate Judge Cheryl L. Pollak on 1/10/2019. (Zisa, Marie)
January 10, 2019 MINUTE ENTRY for Telephone Conference proceeding held before MJ Pollak on 1/10/2019. Appearance for Plaintiff: John Martin Harras. Appearance for Defendant: Raymond A. Castronovo (Aurora) \ David Adam Tauster (Adco) \ Charles Michael Rowan, Jr. (Walsh Electrical Contracting) \ Pro Se Ryan Walsh. Walsh Electrical to produce documents by 2/16/2019. ADCO and Aurora to supplement their productions to the extent any party is missing something. Depositions to proceed unless a stay is granted. Telephone Conference set for 4/3/2019 @ 10:00 AM. (FTR Log #12:23 - 12:35) (Caggiano, Diana)
December 13, 2018 Filing 72 NOTICE of Appearance by John Martin Harras on behalf of Gerald Finkel (aty to be noticed) (Harras, John)
November 5, 2018 Opinion or Order Filing 71 ORDER: Walsh Electrical is to provide responsive documents by 12/7/2018. Aurora is to serve discovery demands, and responses are due in 30 days. Adco and Aurora are to re-send responses to Walsh. The next Telephone Conference is scheduled for 1/10/2019 at 12:00 p.m. So Ordered by Magistrate Judge Cheryl L. Pollak on 11/5/2018. (Caggiano, Diana)
November 5, 2018 MINUTE ENTRY for Telephone Conference held before Magistrate Judge Cheryl L. Pollak on 11/5/2018. Appearance for Plaintiff: Nicole Marimon. Appearance for Defendant: Raymond A. Castronovo (Aurora) \ Jeffery Alan Meyer and David Adam Tauster (Adco) \ Charles Michael Rowan, Jr. (Walsh Electrical Contracting) \ Pro Se Ryan Walsh. Walsh Electrical is to provide responsive documents by 12/7/2018. Aurora is to serve discovery demands, and responses are due in 30 days. Adco and Aurora are to re-send responses to Walsh. Telephone Conference scheduled for 1/10/2019 at 12:00pm. (FTR Log #11:05 - 11:17am.) (Zisa, Marie)
October 19, 2018 Opinion or Order Filing 70 STIPULATION AND ORDER OF CONFIDENTIALITY re #69 . So Ordered by Magistrate Judge Cheryl L. Pollak on 10/19/2018. (Zisa, Marie)
October 17, 2018 Opinion or Order Filing 69 STIPULATION and Order of Confidentiality by Walsh Electrical Contracting, Inc. (Rowan, Charles)
September 12, 2018 Opinion or Order Filing 68 STIPULATION AND ORDER OF CONFIDENTIALITY re #67 So Ordered by Magistrate Judge Cheryl L. Pollak on 9/12/2018. (Caggiano, Diana)
September 11, 2018 Opinion or Order Filing 67 STIPULATION AND ORDER OF CONFIDENTIALITY by Adco Electrical Corporation (Tauster, David)
August 15, 2018 Email Notification Test - DO NOT REPLY (Layne, Monique)
August 13, 2018 Filing 66 Pro Se Consent to Electronic Notification by Linda Walsh. (Layne, Monique)
July 31, 2018 Opinion or Order Filing 65 ORDER: See Order for deadlines. So Ordered by Magistrate Judge Cheryl L. Pollak on 7/31/2018. (Rutbeck-Goldman, Ariela)
July 30, 2018 MINUTE ENTRY for Telephone Conference proceeding held before MJ Pollak on 7/30/2018. Appearance for Plaintiff: Nicole Marimon. Appearance for Defendant: Richard E. Weltman (limited appearance) \ Jeffery Alan Meyer \ Jason Rothman (no notice of appearance filed) \ Charles Michael Rowan, Jr. (in person) \ Pro Se Linda Walsh \ Pro Se Ryan Walsh. By 8/6/2018, parties (except Aurora) are to file discovery requests if they have not already done so. Responses to plaintiffs requests due 8/31/2018. Depositions to proceed. Telephone Conference set for 11/5/2018 @ 11:00 AM. (FTR Log #10:54-11:06) (Caggiano, Diana)
July 6, 2018 Filing 64 REPLY in Support re #38 MOTION to Dismiss filed by Aurora Contractors, Inc.. (Loglisci, David)
June 29, 2018 Opinion or Order Filing 63 ORDER granting #58 Motion to Withdraw as Attorney. Attorney Richard E. Weltman terminated. Defendants Ryan Walsh and Linda Walsh are given thirty (30) days to obtain new counsel or to notify the Court that they wish to proceed pro se. The next Status Conference in this case is currently scheduled for July 30, 2018 at 10:30 a.m. The parties and counsel in this case may appear telephonically. Counsel to contact Chambers once all parties are on the line.So Ordered by Magistrate Judge Cheryl L. Pollak on 6/29/2018. (Rutbeck-Goldman, Ari)
June 29, 2018 MINUTE ENTRY for proceedings held before Magistrate Judge Cheryl L. Pollak: Motion Hearing held on 6/29/2018 re #58 MOTION to Withdraw as Attorney. Hearing held on motion to withdraw - motion granted. Defendants are given 30 days to obtain new counsel or notify court that they wish to proceed pro se. (FTR Log #12:12-12:29.) (Rutbeck-Goldman, Ariela)
June 22, 2018 Filing 62 AFFIDAVIT of Service for Motion for Weltman & Moskowitz, LLP to Withdraw as Counsel and Order Scheduling Hearing served on Linda Walsh and Ryan Walsh on June 20, 2018 and June 22, 2018, filed by Linda Walsh, Ryan Walsh. (Weltman, Richard)
June 22, 2018 Opinion or Order Filing 61 SCHEDULING ORDER: re #58 : In light of counsel's request, the Court schedules a motion hearing for Thursday, June 28 at 12:00 p.m. in Courtroom 6G N, 225 Cadman Plaza East, Brooklyn, NY 11201. Counsel is directed to serve a copy of his motion, if he has not already done so, on his clients, along with a copy of this Order. Defendants Ryan Walsh and Linda Walsh are ORDERED to appear at the Conference in person, along with Mr. Weltman, to address the motion. In lieu of a personal appearance, Mr. Walsh and Ms. Walsh may appear through new counsel. Failure to appear may result in sanctions, including monetary sanctions or entry of a default. The plaintiff and the other defendants in this case may appear telephonically. So Ordered by Magistrate Judge Cheryl L. Pollak on 6/22/2018. (Caggiano, Diana)
June 19, 2018 Opinion or Order Filing 60 Order OF VOLUNTARY DISMISSAL WITH PREJUDICE, that the above-captioned matter is voluntary dismissed with prejudice as against Defts Empire Outlet Builders LLC and BFC Partners, L.P.. Party BFC Partners, L.P. and Empire Outlet Builders, LLC terminated. Ordered by Judge I. Leo Glasser on 6/19/2018. (Layne, Monique)
June 19, 2018 Opinion or Order Filing 59 ORDER, granting substitution of counsel. That Dr. Gerald Finkel, et al., substitutes Vito V. Mundo, State Bar #035346 as counsel of record in place of Parisis G. Flippatos, Esq. (Ordered by Magistrate Judge Cheryl L. Pollak on 6/18/2018) (Galeano, Sonia)
June 19, 2018 Filing 58 MOTION to Withdraw as Attorney by Linda Walsh, Ryan Walsh. (Attachments: #1 Certification, #2 Proposed Order, #3 Affidavit of Service) (Weltman, Richard)
June 18, 2018 Filing 57 NOTICE of Voluntary Dismissal by Gerald Finkel as to Empire Outlet Builders LLC and BFC Partners, L.P. (Marimon, Nicole)
June 15, 2018 Filing 56 MEMORANDUM in Opposition re #38 MOTION to Dismiss filed by Gerald Finkel. (Virginia, Charles)
June 6, 2018 Filing 55 NOTICE of Consent to Change Attorney by Parisis G. Filippatos (Filippatos, Parisis)
June 5, 2018 Opinion or Order Filing 54 NOTICE OF VOLUNTARY DISMISSAL WITHOUT PREJUDICE, that Defendant Walsh Electrical Contracting, Inc., voluntarily dismisses without prejudice and without costs all crossclaims against Defendants Empire Outlet Builders, LLC and BFC Partners, L.P. pursuant to Federal Rule of Civil Procedure 41(a)(1)(A)(i) and (c). Party BFC Partners, L.P. and Empire Outlet Builders, LLC terminated. Ordered by Judge I. Leo Glasser on 6/1/2018. (Layne, Monique)
June 1, 2018 Filing 53 NOTICE of Voluntary Dismissal by Walsh Electrical Contracting, Inc. of Crossclaims against Empire Outlet Builders, LLC and BFC Partners, L.P. (Rowan, Charles)
May 30, 2018 Filing 52 ANSWER to #42 Answer to Complaint,, Crossclaim, / Adco Electrical Corporation's Answer to the Cross-Claim of Walsh Electrical Contracting Inc. by Adco Electrical Corporation. (Tauster, David)
May 29, 2018 Opinion or Order Filing 51 ORDER granting #50 Motion for Extension of Time of defendants Empire Outlet Builders, LLC and BFC Partners LP to answer defendant Walsh Electrical Contracting's cross claims to 6/1/2018. Ordered by Judge I. Leo Glasser on 5/29/2018. (Kessler, Stanley)
May 25, 2018 Filing 50 Consent MOTION for Extension of Time to File Answer to Crossclaim for Defendants Empire Outlet Builders LLC and BFC Partners LP by Walsh Electrical Contracting, Inc.. (Rowan, Charles)
May 25, 2018 Opinion or Order Filing 49 ORDER granting #48 Motion for Extension of Time to File Response/Reply as to #38 MOTION to Dismiss. Response due by 6/15/2018. Reply due by 7/6/2018. Ordered by Judge I. Leo Glasser on 5/25/2018. (Kessler, Stanley)
May 24, 2018 Filing 48 Consent MOTION for Extension of Time to File Response/Reply as to #38 MOTION to Dismiss , #44 Order on Motion for Extension of Time to File Response/Reply by Gerald Finkel. (Marimon, Nicole)
May 24, 2018 Filing 47 NOTICE of Appearance by Nicole Marimon on behalf of Gerald Finkel (aty to be noticed) (Marimon, Nicole)
May 24, 2018 Filing 46 NOTICE of Appearance by Marc A. Tenenbaum on behalf of Gerald Finkel (aty to be noticed) (Tenenbaum, Marc)
May 24, 2018 Filing 45 NOTICE of Appearance by Charles R. Virginia on behalf of Gerald Finkel (aty to be noticed) (Virginia, Charles)
May 18, 2018 Opinion or Order Filing 44 ORDER granting #43 Motion for Extension of Time to File Response/Reply. The amended motion briefing schedule is approved. Ordered by Judge I. Leo Glasser on 5/17/2018. (Kessler, Stanley)
May 17, 2018 Filing 43 MOTION for Extension of Time to File Response/Reply as to #38 MOTION to Dismiss by Gerald Finkel. (Filippatos, Parisis)
May 4, 2018 Filing 42 ANSWER to #1 Complaint, , CROSSCLAIM against Adco Electrical Corporation, Aurora Contractors, Inc., BFC Partners, L.P., Empire Outlet Builders, LLC by Walsh Electrical Contracting, Inc.. (Attachments: #1 Rule 7.1 Corporate Disclosure Statement) (Rowan, Charles)
April 26, 2018 Opinion or Order ORDER granting #41 : Walsh Electrical Contracting, Inc. answer due 5/4/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 4/26/2018. (Rutbeck-Goldman, Ariela)
April 25, 2018 Filing 41 First MOTION for Extension of Time to File Answer by Walsh Electrical Contracting, Inc.. (Rowan, Charles)
April 20, 2018 Filing 40 NOTICE of Appearance by Charles Michael Rowan, Jr on behalf of Walsh Electrical Contracting, Inc. (aty to be noticed) (Rowan, Charles)
April 17, 2018 Filing 39 MINUTE ENTRY for Initial Conference proceeding held before MJ Pollak on 4/17/2018. Initial disclosures due 5/4/2018. Parties to exchange document requests and interrogatories by 5/25/2018 - responses 6/25/2018. Defendant Aurora filed motion to dismiss based on subject matter jurisdiction. Status Conference set for 7/30/2018 @ 10:30 AM. (Caggiano, Diana)
April 13, 2018 Filing 38 MOTION to Dismiss by Aurora Contractors, Inc.. (Attachments: #1 Affidavit in Support, #2 Affidavit in Support, #3 Exhibit, #4 Exhibit, #5 Exhibit, #6 Exhibit, #7 Exhibit, #8 Memorandum in Support, #9 Supplement) (Castronovo, Raymond)
April 13, 2018 Filing 37 ANSWER to #1 Complaint, , CROSSCLAIM against Aurora Contractors, Inc. by Adco Electrical Corporation. (Attachments: #1 Rule 7.1 Corporate Disclosure Statement, #2 Proposed Summons) (Tauster, David)
April 10, 2018 Filing 36 Letter Letter to The Honorable Cheryl L. Pollak from Russell L. Hirschhorn regarding settlement in principle by BFC Partners, L.P., Empire Outlet Builders, LLC (Attachments: #1 Proposed Order) (Hirschhorn, Russell)
April 10, 2018 Opinion or Order ELECTRONIC ORDER re #36 Request granted. Defendants Empire Outlets Builders and BFC Partners, L.P. are excused from attending the conference on 4/17/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 4/10/2018. (Caggiano, Diana)
March 26, 2018 Opinion or Order ELECTRONIC ORDER granting #35 Motion for Extension of Time to Answer - Answer due 4/13/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 3/26/2018. (Rutbeck-Goldman, Ariela)
March 23, 2018 Filing 35 MOTION for Extension of Time to File Answer by Aurora Contractors, Inc.. (Castronovo, Raymond)
March 23, 2018 Opinion or Order ELECTRONIC ORDER granting #33 Motion for Extension of Time to Answer - 4/13/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 3/23/2018. (Caggiano, Diana)
March 23, 2018 Opinion or Order ELECTRONIC ORDER granting #34 Motion for Extension of Time to Answer - answer due 4/13/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 3/23/2018. (Caggiano, Diana)
March 22, 2018 Filing 34 Consent MOTION for Extension of Time to File Answer re #1 Complaint, until April 13, 2018 by Adco Electrical Corporation. (Tauster, David)
March 21, 2018 Filing 33 Consent MOTION for Extension of Time to File Answer re #1 Complaint, through April 13, 2018 by BFC Partners, L.P., Empire Outlet Builders, LLC. (Hirschhorn, Russell)
March 12, 2018 Opinion or Order ELECTRONIC ORDER granting #30 - #31 - #32 : Request for an extension of time to answer or move - 3/23/2018. Initial Conference adjourned to 4/17/2018 @ 10:30 AM. So Ordered by Magistrate Judge Cheryl L. Pollak on 3/12/2018. (Caggiano, Diana)
March 9, 2018 Filing 32 First MOTION to Adjourn Conference (Initial) by Gerald Finkel. (Filippatos, Parisis)
March 9, 2018 Filing 31 Third MOTION for Extension of Time to File Answer by Aurora Contractors, Inc.. (Castronovo, Raymond)
March 9, 2018 Filing 30 Third MOTION for Extension of Time to File Answer re #1 Complaint, by Adco Electrical Corporation. (Tauster, David)
March 8, 2018 Filing 29 Letter to The Honorable Cheryl L. Pollak from Russell L. Hirschhorn re Seeking an Extension of our Deadline to Respond to the Complaint by BFC Partners, L.P., Empire Outlet Builders, LLC (Hirschhorn, Russell)
February 22, 2018 Opinion or Order Filing 28 ORDER granting the application #27 of defendant Aurora Contractors, Inc. for an extension of time to answer to 3/9/2018. Ordered by Judge I. Leo Glasser on 2/22/2018. (Kessler, Stanley)
February 22, 2018 Filing 27 Letter by Aurora Contractors, Inc. (Loglisci, David)
February 22, 2018 Opinion or Order ELECTRONIC ORDER granting #24 Motion for Extension of Time to Answer - answer due 3/9/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 2/22/2018. (Caggiano, Diana)
February 22, 2018 Opinion or Order ELECTRONIC ORDER granting #26 Motion for Extension of Time to File Response/Reply. So Ordered by Magistrate Judge Cheryl L. Pollak on 2/22/2018. (Caggiano, Diana)
February 21, 2018 Filing 26 Letter MOTION for Extension of Time to File Response/Reply as to #1 Complaint, by Adco Electrical Corporation. (Tauster, David)
February 21, 2018 Filing 25 NOTICE of Appearance by David Adam Tauster on behalf of Adco Electrical Corporation (aty to be noticed) (Tauster, David)
February 21, 2018 Filing 24 Letter MOTION for Extension of Time to File Answer re #1 Complaint, by BFC Partners, L.P., Empire Outlet Builders, LLC. (Hirschhorn, Russell)
February 13, 2018 Filing 23 SUMMONS Returned Executed by Gerald Finkel. Adco Electrical Corporation served on 1/2/2018, answer due 2/23/2018. (Filippatos, Parisis)
February 13, 2018 Filing 22 SUMMONS Returned Executed by Gerald Finkel. Aurora Contractors, Inc. served on 1/2/2018, answer due 2/23/2018. (Filippatos, Parisis)
February 13, 2018 Filing 21 SUMMONS Returned Executed by Gerald Finkel. BFC Partners, L.P. served on 1/2/2018, answer due 2/23/2018. (Filippatos, Parisis)
February 13, 2018 Filing 20 SUMMONS Returned Executed by Gerald Finkel. Empire Outlet Builders, LLC served on 1/2/2018, answer due 2/23/2018. (Filippatos, Parisis)
February 13, 2018 Filing 19 SUMMONS Returned Executed by Gerald Finkel. Linda Walsh served on 1/20/2018, answer due 2/12/2018. (Filippatos, Parisis)
February 13, 2018 Filing 18 SUMMONS Returned Executed by Gerald Finkel. Ryan Walsh served on 1/20/2018, answer due 2/12/2018. (Filippatos, Parisis)
February 13, 2018 Filing 17 SUMMONS Returned Executed by Gerald Finkel. Walsh Electrical Contracting, Inc. served on 1/11/2018, answer due 2/1/2018. (Filippatos, Parisis)
February 12, 2018 Filing 16 AMENDED ANSWER to #1 Complaint, by Linda Walsh, Ryan Walsh. (Weltman, Richard)
February 8, 2018 Filing 15 ANSWER to #1 Complaint, by Linda Walsh, Ryan Walsh. (Attachments: #1 Affidavit of Service) (Weltman, Richard)
February 2, 2018 Opinion or Order ELECTRONIC ORDER granting #14 Motion for Extension of Time to Answer - answer due 2/23/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 2/2/2018. (Caggiano, Diana)
February 1, 2018 Filing 14 MOTION for Extension of Time to File Answer re #1 Complaint, / STIPULATION EXTENDING TIME TO RESPOND TO THE COMPLAINT by Adco Electrical Corporation. (Meyer, Jeffery)
January 31, 2018 Filing 13 NOTICE of Appearance by Jeffery Alan Meyer on behalf of Adco Electrical Corporation (aty to be noticed) (Meyer, Jeffery)
January 23, 2018 Filing 12 First MOTION for Extension of Time to File Answer or Response to Complaint by Aurora Contractors, Inc.. (Castronovo, Raymond)
January 23, 2018 Opinion or Order ELECTRONIC ORDER granting #12 Motion for Extension of Time to Answer - answer due 2/23/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 1/23/2018. (Caggiano, Diana)
January 17, 2018 Opinion or Order Filing 11 SCHEDULING ORDER: An Initial Conference is set for 3/15/2018 @ 10:30 AM before Magistrate Judge Cheryl L. Pollak. So Ordered by Magistrate Judge Cheryl L. Pollak on 1/17/2018. (Caggiano, Diana)
January 17, 2018 Opinion or Order Filing 10 ENDORSED LETTER - ORDER TO ANSWER re #9 answer due 2/23/2018. So Ordered by Magistrate Judge Cheryl L. Pollak on 1/17/2018. (Caggiano, Diana)
January 16, 2018 Filing 9 Letter to the Hon. I. Leo Glasser from Russell L. Hirschhorn by BFC Partners, L.P., Empire Outlet Builders, LLC (Hirschhorn, Russell)
January 16, 2018 Filing 8 NOTICE of Appearance by Neil V. Shah on behalf of BFC Partners, L.P., Empire Outlet Builders, LLC (aty to be noticed) (Shah, Neil)
January 16, 2018 Filing 7 NOTICE of Appearance by Russell Laurence Hirschhorn on behalf of BFC Partners, L.P., Empire Outlet Builders, LLC (aty to be noticed) (Hirschhorn, Russell)
January 5, 2018 Filing 6 Summons Issued as to Walsh Electrical Contracting, Inc.. (Layne, Monique)
January 4, 2018 Filing 5 Proposed Summons. Re #1 Complaint, by Gerald Finkel (Filippatos, Parisis)
December 20, 2017 Filing 4 Summons Issued as to Adco Electrical Corporation, Aurora Contractors, Inc., BFC Partners, L.P., Empire Outlet Builders, LLC, Linda Walsh, Ryan Walsh, Walsh Electrical Contracting, Inc.. (Davis, Kimberly)
December 20, 2017 Filing 3 This attorney case opening filing has been checked for quality control. See the attachment for corrections that were made, if any. (Davis, Kimberly)
December 20, 2017 Filing 2 In accordance with Rule 73 of the Federal Rules of Civil Procedure and Local Rule 73.1, the parties are notified that if all parties consent a United States magistrate judge of this court is available to conduct all proceedings in this civil action including a (jury or nonjury) trial and to order the entry of a final judgment. Attached to the Notice is a blank copy of the consent form that should be filled out, signed and filed electronically only if all parties wish to consent. The form may also be accessed at the following link: #http://www.uscourts.gov/uscourts/FormsAndFees/Forms/AO085.pdf. You may withhold your consent without adverse substantive consequences. Do NOT return or file the consent unless all parties have signed the consent. (Davis, Kimberly)
December 20, 2017 NOTICE : Due to the amount of errors made when filing this case electronically, Plaintiff counsel is advised to refer to the Attorney Case Opening Video Tutorial/Manual before filing another case electronically. Please refer to #3 for all corrections made on this case. (Davis, Kimberly)
December 20, 2017 Case Assigned to Judge I. Leo Glasser and Magistrate Judge Cheryl L. Pollak. Please download and review the Individual Practices of the assigned Judges, located on our #website. Attorneys are responsible for providing courtesy copies to judges where their Individual Practices require such. (Davis, Kimberly)
December 18, 2017 Filing 1 COMPLAINT against All Defendants filing fee $ 400, receipt number 0207-10058951 Was the Disclosure Statement on Civil Cover Sheet completed -yes,, filed by Gerald Finkel. (Attachments: #1 Civil Cover Sheet, #2 Proposed Summons Multiple) (Filippatos, Parisis)

Access additional case information on PACER

Use the links below to access additional information about this case on the US Court's PACER system. A subscription to PACER is required.

Access this case on the New York Eastern District Court's Electronic Court Filings (ECF) System

Search for this case: Finkel v. Walsh Electrical Contracting, Inc.
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Web [ Unicourt | Legal Web | Google | Bing | Yahoo | Ask ]
Cross defendant: Walsh Electrical Contracting, Inc.
Represented By: Charles Michael Rowan, Jr.
Represented By: Dipesh Patel
Represented By: George E. Rahn, Jr
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Finance [ Google Finance | Yahoo Finance | Hoovers | SEC Edgar Filings ]
Search Web [ Unicourt | Justia Dockets | Legal Web | Google | Bing | Yahoo | Ask ]
Cross defendant: Empire Outlet Builders, LLC
Represented By: Neil V. Shah
Represented By: Russell Laurence Hirschhorn
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Finance [ Google Finance | Yahoo Finance | Hoovers | SEC Edgar Filings ]
Search Web [ Unicourt | Justia Dockets | Legal Web | Google | Bing | Yahoo | Ask ]
Cross defendant: Adco Electrical Corporation
Represented By: Jeffery Alan Meyer
Represented By: David Adam Tauster
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Finance [ Google Finance | Yahoo Finance | Hoovers | SEC Edgar Filings ]
Search Web [ Unicourt | Justia Dockets | Legal Web | Google | Bing | Yahoo | Ask ]
Plaintiff: Dr. Gerald Finkel
Represented By: Parisis G. Filippatos
Represented By: Vito V. Mundo
Represented By: Charles R. Virginia
Represented By: John Martin Harras
Represented By: Marc A. Tenenbaum
Represented By: Nicole Marimon
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Finance [ Google Finance | Yahoo Finance | Hoovers | SEC Edgar Filings ]
Search Web [ Unicourt | Justia Dockets | Legal Web | Google | Bing | Yahoo | Ask ]
Defendant: Ryan Walsh
Represented By: Richard E. Weltman
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Finance [ Google Finance | Yahoo Finance | Hoovers | SEC Edgar Filings ]
Search Web [ Unicourt | Justia Dockets | Legal Web | Google | Bing | Yahoo | Ask ]
Defendant: Linda Walsh
Represented By: Richard E. Weltman
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Finance [ Google Finance | Yahoo Finance | Hoovers | SEC Edgar Filings ]
Search Web [ Unicourt | Justia Dockets | Legal Web | Google | Bing | Yahoo | Ask ]
Defendant: BFC Partners, L.P.
Represented By: Neil V. Shah
Represented By: Russell Laurence Hirschhorn
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Finance [ Google Finance | Yahoo Finance | Hoovers | SEC Edgar Filings ]
Search Web [ Unicourt | Justia Dockets | Legal Web | Google | Bing | Yahoo | Ask ]
Defendant: Aurora Contractors, Inc.
Represented By: Raymond A. Castronovo
Search News [ Google News | Marketwatch | Wall Street Journal | Financial Times | New York Times ]
Search Finance [ Google Finance | Yahoo Finance | Hoovers | SEC Edgar Filings ]
Search Web [ Unicourt | Justia Dockets | Legal Web | Google | Bing | Yahoo | Ask ]

Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.


Why Is My Information Online?