INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC v. HDR ENGINEERING, INC.
INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC |
HDR ENGINERRING, INC. and HDR ENGINEERING, INC. |
2:2019cv00615 |
May 24, 2019 |
US District Court for the Western District of Pennsylvania |
Nora Barry Fischer |
Contract: Other |
28 U.S.C. § 1332 |
Plaintiff |
Docket Report
This docket was last retrieved on July 18, 2019. A more recent docket listing may be available from PACER.
Document Text |
---|
Filing 20 AMENDED COMPLAINT against HDR ENGINEERING, INC. HDR ENGINEERING, INC. answer due 8/5/2019, filed by INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC. (Butcher, Joseph) |
Filing 19 ORDER denying #12 Defendant's Motion to Stay (details more fully stated in said Order). Signed by Judge Nora Barry Fischer on 7/12/19. (jg) |
Filing 18 RESPONSE IN OPPOSITION to #12 Motion to Stay, filed by INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC. (Attachments: #1 Proposed Order) (Butcher, Joseph) |
Filing 17 ORDER indicating that upon consideration of the parties' Joint Status Report #16 , it is hereby ordered that Plaintiff shall file an Amended Complaint by 7/18/19. Signed by Judge Nora Barry Fischer on 7/3/19. Text-only entry; no PDF document will issue. This text-only entry constitutes the Order of the Court or Notice on the matter. (jg) |
Filing 16 JOINT STATUS REPORT by INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC. (Butcher, Joseph) |
Filing 15 ORDER indicating that for reasons more fully stated within, Defendant's Motion to Dismiss #11 is denied, without prejudice; that the parties shall meet and confer as the Court has directed and file a Status Report with the Court by 7/3/19. Signed by Judge Nora Barry Fischer on 6/27/19. (jg) |
Filing 14 ORDER Response/Briefing Schedule re #12 Defendant's Motion to Stay: Plaintiff's Response to said Motion is due by 7/11/19. Signed by Judge Nora Barry Fischer on 6/27/19. Text-only entry; no PDF document will issue. This text-only entry constitutes the Order of the Court or Notice on the matter. (jg) |
Filing 13 ORDER ON MOTIONS PRACTICE (details more fully in said Order). Signed by Judge Nora Barry Fischer on 6/27/19. (jg) |
Filing 12 MOTION to Stay UNTIL RESOLUTION OF CASE NO. 2:17-CV-00558-NBF by HDR ENGINEERING, INC.. (Attachments: #1 Exhibit, #2 Exhibit, #3 Proposed Order) (Ballod, Christopher) |
Filing 11 MOTION to Dismiss MOTION TO PARTIALLY DISMISS PLAINTIFFS COMPLAINT PURSUANT TO FEDERAL RULE OF CIVIL PROCEDURE 12(B)(6) by HDR ENGINEERING, INC.. (Attachments: #1 Brief, #2 Proposed Order) (Ballod, Christopher) |
Filing 10 NOTICE of Appearance by Christopher E. Ballod on behalf of HDR ENGINEERING, INC.. (Ballod, Christopher) |
Filing 9 SUMMONS/Return of Service Returned Executed by INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC. HDR ENGINEERING, INC. served on 6/6/2019, answer due 6/27/2019. (Butcher, Joseph) |
Filing 8 Disclosure Statement identifying None as corporate parent or other affiliate, by INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC. (Butcher, Joseph) |
Filing 7 Summons Issued as to HDR ENGINEERING, INC. (jv) |
Filing 6 ORDER granting #5 Motion for Franklin J. Smith, Jr., Esquire to Appear Pro Hac Vice on behalf of Plaintiff. Signed by Judge Nora Barry Fischer on 5/29/19. Text-only entry; no PDF document will issue. This text-only entry constitutes the Order of the Court or Notice on the matter. (jg) |
Filing 5 MOTION for attorney Franklin J. Smith, Jr. to Appear Pro Hac Vice, (Filing fee $70, Receipt # 0315-5153599) by INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC. (Attachments: #1 Affidavit in Support of Motion for Admission Pro Hac Vice, #2 Exhibit A - Certificate of Good Standing) (Smith, Franklin) |
Filing 4 NOTICE of Appearance by John W. Zotter on behalf of INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC. (Zotter, John) |
Filing 3 ORDER RE: Rule 12(b) Motions (details more fully stated in said Order). Signed by Judge Nora Barry Fischer on 5/24/19. (jg) |
Filing 2 NOTICE that instant civil action has been designated for placement into the United States District Court's Alternative Dispute Resolution program. Parties are directed to fully complete the required 26(f) report, which includes the stipulation of selecting an ADR process. Counsel for plaintiff (or in the case of a removal action, counsel for removing defendant) shall make service of the notice on all parties. (jg) |
Filing 1 COMPLAINT against HDR ENGINEERING, INC. (Filing fee, including Administrative fee, $400, receipt number 0315-5150347), filed by INFRASTRUCTURE CONSULTING & ENGINEERING, PLLC. (Attachments: #1 Civil Cover Sheet, #2 Summons as to HDR Engineering, Inc.) (jv) |
CLERK'S OFFICE QUALITY CONTROL MESSAGE re #1 Complaint,. ERROR: Party did not file disclosure statement as required pursuant L.R. 7.1.1. CORRECTION: Attorney advised to file statement within 7 days. This message is for informational purposes only. Disclosure Statement due by 5/31/2019. (jv) |
Access additional case information on PACER
Use the links below to access additional information about this case on the US Court's PACER system. A subscription to PACER is required.
Access this case on the Pennsylvania Western District Court's Electronic Court Filings (ECF) System
- Search for Party Aliases
- Associated Cases
- Attorneys
- Case File Location
- Case Summary
- Docket Report
- History/Documents
- Parties
- Related Transactions
- Check Status
Disclaimer: Justia Dockets & Filings provides public litigation records from the federal appellate and district courts. These filings and docket sheets should not be considered findings of fact or liability, nor do they necessarily reflect the view of Justia.